- cross-posted to:
- technology@lemmy.world
- cross-posted to:
- technology@lemmy.world
You must log in or # to comment.
- Also in the article: - NuScale Power, previously expected to be the first U.S. company licensed to build a small modular reactor, said this month it was terminating a planned 462MW project in Utah because of rising costs. - China has a goal to produce 10% of electricity from nuclear by 2035 and 18% by 2060, but as of September this year had not met its 2020 target to install 58 gigawatts of nuclear capacity. - China has also not signed a pledge by 20 countries at the COP28 climate conference taking place in Dubai to triple nuclear power capacity by 2050. - Kinda shows nuclear is slowly dying with the rise of cheap renewable energy. 


