Last weeks thread here

Welcome to this week’s casual kōrero thread!

This post will be pinned in this community so you can always find it, and will stay for about a week until replaced by the next one.

It’s for talking about anything that might not justify a full post. For example:

  • Something interesting that happened to you
  • Something humourous that happened to you
  • Something frustrating that happened to you
  • A quick question
  • A request for recommendations
  • Pictures of your pet
  • A picture of a cloud that kind of looks like an elephant
  • Anything else, there are no rules (except the rule)

So how’s it going?

  • Dave@lemmy.nzOPM
    link
    fedilink
    arrow-up
    1
    ·
    5 months ago

    I’m wondering about the heating thing. The cables already carry current. Normally for electric heating you’d have electricity going through a wire with high resistance to make the heat. So you’d think you’d run such a wire along the length of the cable. Putting fan heaters everywhere isn’t going to be efficient, you need it on the wire in the place it’s needed.

    But if it’s on a live wire, can that work? Or would it just become part of the larger wire and not heat up as the electricity flows through the path of lower resistance? Plus the risk of the pantograph damaging the heating wire.

    • thevoyagekayaking@lemmy.nz
      link
      fedilink
      arrow-up
      2
      ·
      5 months ago

      It’s been done with power lines overseas, where they somehow increase the current in the lines to heat them up to shed ice.

      No idea how it actually works though, I’ll have to look into it.

    • thevoyagekayaking@lemmy.nz
      link
      fedilink
      arrow-up
      2
      ·
      5 months ago

      This is how power line deicing works on systems overseas. You need two legs to the circuit, so it would involve either isolating lines from each other on double track, or earthing out the end of the lines, and using the tracks as a return path.

      The option I was actually thinking about was having a heated pantograph of some type.

      https://en.m.wikipedia.org/wiki/Levis_De-Icer

      • Dave@lemmy.nzOPM
        link
        fedilink
        arrow-up
        2
        ·
        5 months ago

        That’s really cool! It sounds like they switch the section to a separate circuit and then pile a carefully controlled high voltage current into it to warm up the line without melting it. But it also says the line remains operational, if I’m reading it right. Not sure how you send too much power through the line without affecting the trains using the line.

        Anyway, it sounds like this is the only system like it in the world, and it was installed after heavy snow caused a collapse of much of the network. What I take from that is that it’s probably really expensive to install, and probably not worth it in Wellington. One of the ice scraping pantograph options probably makes more sense.

        I guess for your heated pantograph option you’d run it on a special de-icer train at low speed? I would think melting the ice off via a pantograph would take a really long time.

        • thevoyagekayaking@lemmy.nz
          link
          fedilink
          arrow-up
          2
          ·
          5 months ago

          The line is out of action while deicing is taking place, but only for the shortest amount of time necessary.

          That’s what I’m thinking, yes. Although you could pump a lot of heat into the pantograph, and pair it up with a scraper at the same time.

          It wouldn’t be able to run line speed, but it would be reasonably fast, I’d think.

          • Dave@lemmy.nzOPM
            link
            fedilink
            arrow-up
            2
            ·
            5 months ago

            Ah yes paired with a scaper that would be quite effective. I was thinking you melt it but then the heat is gone and the cable is still frozen so it would refreeze. But if you soften it with the heat then scape it, that could work quite well.

            Probably not much chance of getting it implemented in Wellington, though. There might be a slim chance if there was an off the shelf solution, but from my reading into this is seems everything is quite custom.