Get those construction contacts signed!

  • lntl@lemmy.mlOP
    link
    fedilink
    arrow-up
    1
    ·
    3 年前

    Renewables alone can’t meet New Yorks base load. Nuclear is the only technology that can. Gas turbines were connected to the grid to cover Indian points load which is a disaster.

    Nuclear must be complemented with as much renewable capacity as possible. There is no other way.