Get those construction contacts signed!

  • lntl@lemmy.mlOP
    link
    fedilink
    arrow-up
    1
    ·
    1 year ago

    Renewables alone can’t meet New Yorks base load. Nuclear is the only technology that can. Gas turbines were connected to the grid to cover Indian points load which is a disaster.

    Nuclear must be complemented with as much renewable capacity as possible. There is no other way.