• StorageB
    link
    fedilink
    English
    arrow-up
    1
    ·
    16 hours ago

    If you have an accessible attic, they will run the lines up there. There shouldn’t be any cutting drywall except for the hole for the new outlet. They will run the line up the wall in-between the studs into the attic.