The Banana Pi BPI-M7 single board computer is equipped with up to 32GB RAM and 128GB eMMC flash, and features an M.2 2280 socket for one NVMe SSD, three display interfaces (HDMI, USB-C, MIPI DSI), two camera connectors, dual 2.5GbE, WiFi 6 and Bluetooth 5.2, a few USB ports, and a 40-pin GPIO header for expansion.

  • Bondrewd@lemmy.world
    link
    fedilink
    English
    arrow-up
    7
    ·
    edit-2
    1 year ago

    My brother in christ. A used PC has powersupply, case, storage and cooling. This is about the basic kit you need for a proper pi5 experience. You can very easily hit the 100 dollar mark.

    Also, most of the used business PC will have 8G RAM, which would put your little ARM funsies up to the $130 budget range.

    And you would still only have 4 shitty cores, no expandability.

    • DaGeek247@kbin.social
      link
      fedilink
      arrow-up
      4
      ·
      1 year ago

      And it wouldn’t have gpio, would require at least a square foot of floor/desk space, and it would cost more to run. Price. Size. Gpio. Nobody is running their remote controlled car with a cabled desktop sat on it.

      • TCB13@lemmy.worldOP
        link
        fedilink
        English
        arrow-up
        3
        ·
        1 year ago

        If you just need GPIO for low level electronics there are 20$ SBCs that get the job done. No need for a full RPi5.

      • Bondrewd@lemmy.world
        link
        fedilink
        English
        arrow-up
        1
        ·
        1 year ago

        Not sure how much more it would cost to run. If you only really talk about stuff a pi can do as well, you wont be maxing out your cores. You will use a bit more maybe. Nothing sort of whatever you only really keep in mind for monero mining.

      • Aceticon@lemmy.world
        link
        fedilink
        English
        arrow-up
        1
        ·
        edit-2
        1 year ago

        If you’re running a remote controlled car you want something way down the power scale like as ESP32 or even an ATTiny + radio HW.

        Mind you, I don’t disagree with your actual point, I just think the example you used wasn’t correct.