You must log in or # to comment.
No, it is definitely first of Feb.
Engineer: the glass is twice as large as necessary.
Actual engineer: the glass requires a 2.0 factor of safety.
“Anyone can design a bridge that stands. It takes an engineer to design a bridge that barely stands.”
2.0 safety factor for a glass of water seems wasteful.
Or the first of February…
True, but YYYY/MM/DD is the superior date format. /s
YYYY-MM-DD…
So it’s February 1901 then
That’s a positive Outlook
Word