• fubarx@lemmy.world
    link
    fedilink
    arrow-up
    8
    ·
    1 day ago

    Disaster Recovery Concepts:

    • Recovery time objective (RTO): maximum time to restore system function.
    • Recovery point objective (RPO): maximum age of data needed to resume operations.
    • Recovery consistency objective (RCO): how many inconsistent entries are allowed in recovered data.
    • Sierra Madre objective (SMO): We don’t need no stinkin’ backups.
    • Inucune@lemmy.world
      link
      fedilink
      arrow-up
      1
      ·
      5 hours ago

      Get disaster insurance, wait for failure, collect a big c-suite payout and move to the next company.

      Everyone else gets to find new exciting jobs.