      There is no reason to spend billions of dollars on a rail line that is not needed as long as Zionists do not start an unnecessary war.

      Maybe Zionists could stop their death cult beliefs instead of making the rest of us pay for their psycho-fairy tale crap.

        • rafoix@lemmy.zip
          link
          fedilink
          arrow-up
          4
          ·
          1 天前

          It seems like those psychopaths know that their control of America politics is on its last leg so they’re willing to start any war even without the multi-year propaganda campaign that the last major war had.

        • rafoix@lemmy.zip
          link
          fedilink
          arrow-up
          18
          ·
          2 天前

          Did I ever mention the rail vs road cost? Two massively dumb ideas that are infinitely worse than just not killing Iranians.

          It’s actually very easy to not kill people and raise energy prices worldwide.

        • bountygiver [any]@lemmy.ml
          link
          fedilink
          English
          arrow-up
          10
          ·
          edit-2
          2 天前

          not blowing things up unnecessarily costs way less than any building projects. Even if the rails were built, not a lot of things are stopping it from getting struck by missiles.

    • dustyData@lemmy.world
      link
      fedilink
      arrow-up
      9
      ·
      2 天前

      I think you’re underestimating the sheer scale of the endeavor. It would need to cross several deserts, a mountain range and an international border. As drawn in the image there’s almost 800km, let’s say, between Abu dabi and Al Ashkara. Being very generous with the geography, a costly project like this could run for $10 MM per Km or about $8 Bn just for the construction (probably more as it would not be a straight line), plus maintenance (in this place it could be up to 30% of the construction cost a year), plus rolling stock and operation costs. Feeding and getting water to those workers would be a logistics nightmare in the middle of the desert. Another couple of billions for unloading and loading facilities that could handle millions of barrels daily, to be built from scratch.

      That’s before even reaching the question of timeframes. Rail can be built really fast, but fast is roughly one kilometer of rail a month. Assuming all permits, contracts and administrative load can be fast tracked (it can take years to design and approve a project of this scale), it would take 66 work years (surely distributed between several work crews) to complete a new heavy railway. Which balloons the cost by a 50% factor for each new crew to accelerate construction.

      For reference, the Australian, Adelaide to Darwin rail line is 4 times longer than this. Its construction started in 1910 and was finished in 2004. So, Oman-UAE should have this rail in place and operating no sooner than 2045 if they rush very hard.

      By the time the new rail is laid out, Israel would’ve completed their genocide of Iran.