• 16 Posts
  • 224 Comments
Joined 2 年前
cake
Cake day: 2023年6月28日

help-circle

  • I meant structure as in existing stuff, not ‘structural’ as in load-bearing. Extra wood would indeed still count as ‘structure’ within the context I meant.

    This is, however, not just extra wood. What was cut through in the picture is floor joists, which are what holds up the flooring and supports whatever is on the floor, including people and furniture. Cutting these joists severely compromised the integrity of the floor. Now instead of a squeak from stepping in that spot, it’s far more likely that a loud crack followed by a fall through the floor will be the result of a heavy step.

















  • Solving percents. I use this to predict gross and net of my paychecks when I do my budget.

    Net               X
    ------    =    ------
    Gross            100
    
    
    (GrossX) = (Net × 100)
    
    GrossX ÷ (Net × 100) = X
    
    Example;
    
    200             X
    ------    =   -------
    250            100
    
    Step A
    200 × 100 = 20000
    
    Now 250X = 20000
    
    Step B
    20000÷250=80
    
    Therefore X=80
    Also expressed as 80% of 250 = 200.
    

    It’s also kinda handy when figuring out sales and stuff at the store, sometimes.